557 Engine Restoration Company

The front end of 557. "Work now is focused on preparing the boiler for the Hydro Test. This is a slow meticulous process starting with 50 psi air in the boiler and spraying soapy water while looking for bubbles or fizz at all the seams and penetrations of the pressure vessel." 7/17/23