10

 

10

Robert Krol was sitting at the Whittier tunnel for an extra hour while this monster freight goes through. The freight was too long to fit between the rail crossing in Whittier and the green light for the tunnel so they had to back up, pick another track of cars, build up the air for the brakes and then go through the tunnel. This resulted in a one hour delay for car traffic. 4/16/16