Work train

Dumping coal dust from charcoal pots, used to melt ice to clear rails.

 

Work train

This is how we patrolled track when the snow got too deep at Tunnel section.

 

Work train

Water leaks through the mountain and freezes when it meets the cold air. Dripping water also freezes over the rails creating a hazard for the trains. The ice has to be chipped or melted everywhere it creates a problem.

 

Work train

Chipping accumulated ice off the walls inside the tunnels.

 

Work train

The gas car with trailer full of ice from inside the tunnel.

 

Work train

Tunnel section - note all the half drums for burning charcoal to melt ice.

 

Photos from my two years at Tunnel Section - circa 1976-1977

Photos courtesy of Ed Rosek